Areas of Concern for Measures
The following areas of concern have been identified by residents as requiring local KPIs:
  • Cleaning & Grounds Maintenance
  • Lift Performance 
  • No. of Communal Repairs Reported by Area
  • No. Communal Repairs Completed 1st Visit by Area
  • Illegal Dumping
  • Anti Social Behaviour incidents reported and closed
  • Thermal efficiency of housing stock (especially focused on improving older housing stock)
  • Security measures (especially focused on improving older housing stock)
The following areas were considered but rejected:
  • Gas Safety Checks

What does "Local" mean?

There has been lots of debate about what is a useful size of area to measure - too few and the KPIs are not really useful for examining local issues. too many and the numbers will become statistically insignificant - in other words they won't tell us anything meaningful.

So that ISHA can start analysing the work required (systems changes, process changes) to collect and report on local KPIs, an interim answer has been chosen, that the measures will be analysed on 5 areas: 1 for Waltham Forest, 2 for Islington, and 2 for Hackney. This will not prevent later work to breakdown the analysis into even more local areas if there is value in that, but will allow progress to be made.

The areas are now set up on Civica UH:
  • Area 1 Islington N1 plus Camden – (ISHA has only one block in Camden so didn’t make sense to be on its own)
  • Area 2 rest of Islington  N4,N7 EC1 N19 N5
  • Area 3 Hackney E2,8,9,5 and N16
  • Area 4 Hackney N1
  • Area 5 Waltham forest
Action: ISHA will update with the number of properties (residential units) in each area

Deeper Analysis of Measures

Producing and reporting on the desired measures will require changes to computer systems and ISHA processes, and before either of those things can happen, more analysis is required.

At the next meeting we will focus on completing a set of the following information for each proposed KPI:
  1. Area of concern to be measured
  2. Specific measure
  3. Source of data
  4. Formula
  5. Collection frequency
  6. Reporting frequency
  7. Reporting format and method
  8. System changes needed (brief comment)
  9. Process changes needed (brief comment)
  10. Estimated cost and/or resource to set up
  11. Estimated time to set up
  12. Estimated cost and/or resource to operate
  13. Resident-set priority
  14. Priority to implement (to be agreed between RWG and ISHA taking into account the above factors)
 An excel worksheet with these columns is attached to this page, now updated after the Repairs Working Group of 21/04/2010.





 RSS of this page

This website is using software called a "wiki", designed to make it easy for everyone in the group to contribute
How to contribute   |   Need help?